PROJECT:

ADANA SPP

The investment, which started in February 2018, was completed and commissioned in May 2018 under the EPC Contract by MUREL YATIRIM İNŞAAT A.Ş.

TECHNICAL INFORMATION:

LOCATION

KOZAN

INSTALLED POWER (kWe)

7.941,99 kWp

INSTALLED POWER (kWp)

9.804,00 kWe

PV MODÜL

HT-SAAE

PV MODULE QTY

28.707

INVERTER MAKE

HUAWEİ

INVERTER QTY

177

INSTALLATION PERIOD

3 MONTHS

INSTALLATION TYPE

GROUND

SCOPE

TURNKEY

ADANA GES ADANA GES ADANA GES ADANA GES ADANA GES ADANA GES