PROJECT:

ADIYAMAN SPP

The investment, which started in September 2017, was completed and commissioned in December 2017 under the EPC contract by MUREL YATIRIM İNŞAAT A.Ş.

TECHNICAL INFORMATION:

LOCATION

ADIYAMAN

INSTALLED POWER (kWe)

11.155,00 kWp

INSTALLED POWER (kWp)

9.804,00 kWe

PV MODÜL

HT-SAAE

PV MODULE QTY

34.860

INVERTER MAKE

HUAWEİ

INVERTER QTY

249

INSTALLATION PERIOD

4 MONTHS

INSTALLATION TYPE

GROUND

SCOPE

TURNKEY