PROJECT:
ADIYAMAN SPP
The investment, which started in September 2017, was completed and commissioned in December 2017 under the EPC contract by MUREL YATIRIM İNŞAAT A.Ş.
TECHNICAL INFORMATION:
LOCATION
|
ADIYAMAN
|
INSTALLED POWER (kWe)
|
11.155,00 kWp
|
INSTALLED POWER (kWp)
|
9.804,00 kWe
|
PV MODÜL
|
HT-SAAE
|
PV MODULE QTY
|
34.860
|
INVERTER MAKE
|
HUAWEİ
|
INVERTER QTY
|
249
|
INSTALLATION PERIOD
|
4 MONTHS
|
INSTALLATION TYPE
|
GROUND
|
SCOPE
|
TURNKEY
|