Murel Construction
We proudly contribute to power plant construction by partnering with Türkiye’s largest energy companies on both domestic and international projects. Our comprehensive EPC solutions seamlessly cover every stage — from decommissioning and assembly to mechanical and electrical installations, and final commissioning.
Specializing in heavy industry investments, we lead projects in steel production facilities and innovative manufacturing plants. We are committed to delivering high-efficiency, environmentally friendly solutions that meet both local and international standards.
With a robust engineering infrastructure, extensive equipment capacity, and a global presence across five continents, we provide unparalleled expertise in the energy and industrial sectors. Our team is dedicated to delivering efficient, sustainable, and high-quality results that meet the diverse needs of our clients.
Completed Projects
MUREL DEMİR ÇELİK TİC. A.Ş. HAYRABOLU WIRE MESH STEEL PRODUCTION FACILITY
Between 2023 and 2024, Murel Demir Çelik ve Ticaret A.Ş. undertook the Hayrabolu Wire Mesh Steel Production Facility project, with Murel Yatırım A.Ş. responsible for the construction, mechanical, electrical, and commissioning works.
KAPTAN DEMİR ÇELİK WIRE ROD ROLLING MILL FACILITY
To increase and modernize its production capacity, Kaptan Demir Çelik Endüstrisi ve Ticaret A.Ş. planned the construction of a Wire Rod Rolling Mill Facility capable of producing 900,000 tons annually.
AKSA POWER PLANT B
Murel Yatırım İnşaat A.Ş. have been completed the EPC works for Aksa Enerji Üretim A.Ş. ‘s 230 MW Electric Power Plant project in Uzbekistan and successfully delivered the equipment.
AKSA POWER PLANT A
Aksa Enerji Üretim A.Ş. and Murel Yatırım İnşaat A.Ş. completed the 240 MW Uzbekistan Natural Gas Combined Cycle Power Plant project on time under an EPC basis.
VARAKA THERMAL POWER PLANT
The Varaka Thermal Power Plant, with a 40 MW capacity, was constructed to meet the energy needs of Varaka Paper Factory. Construction began in 2016 and was completed in 2018, delivered as a turnkey project.
Osmaniye Solar Power Plant Project
Under an EPC contract, Murel Yatırım İnşaat A.Ş. completed the 2,117.22 kWp Osmaniye Solar Power Plant project, including the procurement process, which started in April 2018 and was successfully commissioned in just 2 months by June 2018.
Adana Solar Power Plant Project
Under an EPC contract, Murel Yatırım İnşaat A.Ş. completed the 7,941.99 kWp Adana Solar Power Plant project, including the procurement process, which started in February 2018 and was successfully commissioned in just 3 months by May 2018.
Adıyaman Solar Power Plant Project
Under an EPC contract, Murel Yatırım İnşaat A.Ş. completed the 11,155.00 kWp Adıyaman Solar Power Plant project, including the procurement process, which started in September 2017 and was successfully completed and commissioned in just 4 months by December 2017.