PROJECT:
OSMANİYE SPP
The investment, which started in April 2018, was completed and commissioned in June 2018 under the EPC contract by MUREL YATIRIM İNŞAAT A.Ş.
TECHNICAL INFORMATION:
LOCATION
|
HASANBEYLİ
|
INSTALLED POWER (kWe)
|
2.117,22 kWp
|
INSTALLED POWER (kWp)
|
1.800,00 kWe
|
PV MODÜL
|
HT-SAAE
|
PV MODULE QTY
|
7.476
|
INVERTER MAKE
|
HUAWEİ
|
INVERTER QTY
|
46
|
INSTALLATION PERIOD
|
2 AY
|
INSTALLATION TYPE
|
GROUND
|
SCOPE
|
TURNKEY
|