PROJECT:

OSMANİYE SPP

The investment, which started in April 2018, was completed and commissioned in June 2018 under the EPC contract by MUREL YATIRIM İNŞAAT A.Ş.

TECHNICAL INFORMATION:

LOCATION

HASANBEYLİ

INSTALLED POWER (kWe)

2.117,22 kWp

INSTALLED POWER (kWp)

1.800,00 kWe

PV MODÜL

HT-SAAE

PV MODULE QTY

7.476

INVERTER MAKE

HUAWEİ

INVERTER QTY

46

INSTALLATION PERIOD

2 AY

INSTALLATION TYPE

GROUND

SCOPE

TURNKEY

ADANA GES ADANA GES