MUREL INVESTMENT AND CONSTRUCTION

BUILDING THE FUTURE

VARAKA THERMAL POWER PLANT

Varaka Thermal Power Plant, with a capacity of 40 MW, has been built to provide electricity and steam to Varaka Paper Factory with respect to international standards.

Project Detail
Varaka
Plant A

AKSA - POWER PLANT A Turkey & Uzbekistan

Completing disassembly of 4 gas turbines, 4 steam boilers, 2 steam turbines and generator for combine cycling, 3 transformers, all auxiliary equipments and complete steel construction and piping of 240 MW combined cycle power plant, as well as its cleaning, painting, packing and transportation operations to Uzbekistan in 4 months.

Project Detail

AKSA - POWER PLANT B Turkey & Uzbekistan

Disassembly of 2 combined power plants, located in Manisa and Van, 115 MW each, with a total of 230 MW energy production capacity, including; 24 gas motors, 24 steam boilers, 2 steam turbines and generator for combine cycling, 2 transformers, all auixilary equipments, steel construction, 1140 electricity panels, 385000 meters of cabling, 1280 instruments, and completion of cleaning, painting, packing and transporting operations to Uzbekistan in 80 days.

Project Detail
SANTRAL B