02.2018 - 05.2018 & Kozan/Adana, Türkiye

Adana Solar Power Plant Project

Project Informations

OWNER

Murel Enerji Üretim A.Ş.

CONTRACT DATE

01.02.2018

FINISH DATE

01.05.2018

AGREEMENT TYPE

Turnkey

INSTALLATION TYPE

Ground

PROJECT LOCATION

Kozan / Adana

INSTALLED CAPACITY (kWp)

7.941,99

INSTALLED CAPACITY (kWe)

9.804,00

 
 
 
 
PV MODULE BRAND

HT-SAAE

 
 
 
 
NUMBER OF PV MODULE

28.707

 
 
 
 
INVERTER BRAND

HUAWEI

 
 
 
 
NUMBER OF INVERTER

177

 
 
 
 
DURATION

3 MONTHS

 
 
 
 

Project Details

Adana Solar Power Plant (SPP) Investment Project, with an installed capacity of 7,941.99 kWp, was successfully commissioned in May 2018. The project, executed under an EPC (Engineering, Procurement, and Construction) contract, was completed within an impressive timeframe of just three months, including the procurement process by Murel Yatırım İnşaat A.Ş..