2016-2018 & Balıkesir, Türkiye

VARAKA THERMAL POWER PLANT

MECHANICAL, ELECTRICAL & COMMISSIONING WORKS

Project Information

EMPLOYER

Albayrak Varaka Kağıt Sanayi A.Ş.

SCOPE OF CONTRACT

Mechanical, Electrical, and Commissioning Works

LOCATION

Balıkesir / Türkiye

CONTRACT DATE

01.01.2016

COMPLETION DATE

01.05.2018

Project Details

Varaka Thermal Power Plant Project is a thermal power plant with a capacity of 40 MW for electricity generation and 150 tons/hour of steam production, designed to meet the energy needs of the Varaka Kağıt Fabrikası. The project was executed under a turnkey contract signed in 2016 between Albayrak Varaka Kağıt Sanayi A.Ş. and Murel Yatırım İnşaat A.Ş. for all mechanical, electrical, and commissioning work.

The site handover was completed on 01.09.2016. The project was successfully delivered to the employer on 01.05.2018 in accordance with the international standards and within the total time frame of the contract.

The primary fuel for the plant is coal, and the electricity and steam produced also supply the processes of the factory located parallel to the plant. The plant reaches its production capacity of 40 MW when all the steam is utilized.

General Scope of Works

  • 10,000 WDI alloy and 15,000 WDI non-alloy pipe welding, small, medium, and large diameter piping, and pipe bridge constructions
  • 600 tons of boiler steel installation and welding
  • Refractory works, fan assembly, and calibration
  • Water treatment plant assembly and commissioning
  • Cooling tower and piping installation and commissioning
  • Chimney and filter system installation
  • Coal crusher and conveyor system installation
  • 220,000 meters of cable installation
  • 16,000 terminations
  • 77 electrical panels and full automation works
  • Facade cladding and insulation works