Founded in Istanbul with the aim of contributing to Türkiye’s growth, Murel operates with principles and expertise, ensuring that every project is planned and executed with the right people for the right tasks.
HAYRABOLU WIRE MESH STEEL PRODUCTION FACILITY
Between 2023 and 2024, Murel Yatırım İnşaat A.Ş. undertook the construction, mechanical, electrical, and commissioning works for the Hayrabolu Wire Mesh Steel Production Facility project of Murel Demir Çelik Tic. A.Ş..
KAPTAN IRON & STEEL WIRE ROD MILL FACILITY
To enhance and modernize the production capacity of Kaptan Demir Çelik Endüstrisi ve Ticaret A.Ş., the construction of a Wire Rod Mill Facility with a total production capacity of 900,000 tons has been planned.
AKSA - POWER PLANT B (Türkiye & Uzbekistan)
The first phase of the project delivered 24 gas engines with a total energy production capacity of 230 MW for two plants located in Manisa and Van, each with 115 MW capacity.
AKSA POWER PLANT A
AKSA POWER PLANT A
A turnkey contract was signed between AKSA Enerji Üretim A.Ş. and MUREL Yatırım İnşaat A.Ş. for the dismantling and assembly phases of the 240 MW Natural Gas Combined Cycle Power Plant Project (CCPP) in Uzbekistan, including EPC services (dismantling, engineering, procurement, construction, mechanical, electrical, installation, testing, and commissioning).
VARAKA THERMAL POWER PLANT
Planned to meet the electricity and steam needs of Varaka Paper Factory, this project features a 40 MW electricity and 150 tons/hour steam capacity fluidized bed Varaka Thermal Power Plant. The turnkey contract, signed in 2016 between Albayrak Varaka Kağıt Sanayi A.Ş. and MUREL Yatırım İnşaat A.Ş., included the entire scope of electrical, mechanical, and commissioning work.
OSMANİYE SOLAR POWER PLANT PROJECT
Osmaniye Solar Power Plant (SPP) Investment Project, with an installed capacity of 2.177,22 kWp, was successfully commissioned in June 2018. The Project, executed under an EPC (Engineering, Procurement, and Construction) contract, was within a short period of two months, including the procurement process by Murel Yatırım İnşaat A.Ş..
ADANA SOLAR POWER PLANT PROJECT
Adana Solar Power Plant (SPP) Investment Project, with an installed capacity of 7,941.99 kWp, was successfully commissioned in May 2018. The project, executed under an EPC (Engineering, Procurement, and Construction) contract, was completed within an impressive timeframe of just three months, including the procurement process by Murel Yatırım İnşaat A.Ş..
ADIYAMAN SOLAR POWER PLANT PROJECT
Adıyaman Solar Power Plant (SPP) Investment Project, with an installed capacity of 11.155,99 kWp, was successfully commissioned in September 2017. The project, executed under an EPC (Engineering, Procurement, and Construction) contract, was within a short period of four months, including the procurement process by Murel Yatırım İnşaat A.Ş..
HAYRABOLU WIRE MESH STEEL PRODUCTION FACILITY
Between 2023 and 2024, Murel Yatırım İnşaat A.Ş. undertook the construction, mechanical, electrical, and commissioning works for the Hayrabolu Wire Mesh Steel Production Facility project of Murel Demir Çelik Tic. A.Ş..
KAPTAN IRON & STEEL WIRE ROD MILL FACILITY
To enhance and modernize the production capacity of Kaptan Demir Çelik Endüstrisi ve Ticaret A.Ş., the construction of a Wire Rod Mill Facility with a total production capacity of 900,000 tons has been planned.
AKSA - POWER PLANT B (Türkiye & Uzbekistan)
The first phase of the project delivered 24 gas engines with a total energy production capacity of 230 MW for two plants located in Manisa and Van, each with 115 MW capacity.
AKSA POWER PLANT A
AKSA POWER PLANT A
A turnkey contract was signed between AKSA Enerji Üretim A.Ş. and MUREL Yatırım İnşaat A.Ş. for the dismantling and assembly phases of the 240 MW Natural Gas Combined Cycle Power Plant Project (CCPP) in Uzbekistan, including EPC services (dismantling, engineering, procurement, construction, mechanical, electrical, installation, testing, and commissioning).
VARAKA THERMAL POWER PLANT
Planned to meet the electricity and steam needs of Varaka Paper Factory, this project features a 40 MW electricity and 150 tons/hour steam capacity fluidized bed Varaka Thermal Power Plant. The turnkey contract, signed in 2016 between Albayrak Varaka Kağıt Sanayi A.Ş. and MUREL Yatırım İnşaat A.Ş., included the entire scope of electrical, mechanical, and commissioning work.
OSMANİYE SOLAR POWER PLANT PROJECT
Osmaniye Solar Power Plant (SPP) Investment Project, with an installed capacity of 2.177,22 kWp, was successfully commissioned in June 2018. The Project, executed under an EPC (Engineering, Procurement, and Construction) contract, was within a short period of two months, including the procurement process by Murel Yatırım İnşaat A.Ş..
ADANA SOLAR POWER PLANT PROJECT
Adana Solar Power Plant (SPP) Investment Project, with an installed capacity of 7,941.99 kWp, was successfully commissioned in May 2018. The project, executed under an EPC (Engineering, Procurement, and Construction) contract, was completed within an impressive timeframe of just three months, including the procurement process by Murel Yatırım İnşaat A.Ş..
ADIYAMAN SOLAR POWER PLANT PROJECT
Adıyaman Solar Power Plant (SPP) Investment Project, with an installed capacity of 11.155,99 kWp, was successfully commissioned in September 2017. The project, executed under an EPC (Engineering, Procurement, and Construction) contract, was within a short period of four months, including the procurement process by Murel Yatırım İnşaat A.Ş..